5 Key Preparations Customers Should Make Before Prefabricated Container Houses Arrive
2026-01-22
5 Key Preparations Customers Should Make Before Prefabricated Container Houses Arrive



After you place an order for a prefabricated container house, the process from production to transportation and installation typically takes several weeks to two months. This period is not about passively waiting, but rather a crucial stage for thorough preparation. Here is a checklist of preparations you should complete before your container house arrives at its destination:

1. Site Preparation: Establishing a Solid Foundation

Land Leveling and Measurement

Clear vegetation, gravel, and other obstacles from the site.

Ensure the ground is level enough to meet installation requirements (generally, an error of no more than 2 cm per meter is required).

Accurately mark the placement location according to the house dimensions, leaving appropriate spacing.

Foundation Treatment
Choose a suitable foundation type based on the supplier's recommendations, ensuring the foundation strength is sufficient to withstand the weight of the house and environmental loads.

A: Concrete Slab Foundation: Best durability, requires pre-pouring and curing.

B: Independent Foundation Piers: Lower cost, suitable for temporary or non-permanent installations.

C: Strip Foundation: A choice balancing economy and stability.




2. Infrastructure: Connecting to Modern Life

Water and Electricity Layout

Contact local water and electricity departments to understand connection conditions and costs.

Pre-lay water supply pipes and drainage systems.

Install standard-compliant electrical interfaces and distribution boxes.
Consider whether a septic tank or connection to the municipal sewage system is needed.

3. Legal and Administrative Procedures

Permit Application

Check with local planning authorities to see if a building permit is required.
Confirm if the land use meets the requirements for temporary or permanent construction.
Prepare necessary application materials (land certificate, house specification documents, etc.).

4. Installation Support Preparation

Equipment and Personnel

Book cranes or other necessary equipment (if needed).
Confirm the installation team's arrival time and working conditions.
Prepare temporary sheds or facilities for the installation team.

5. Final Inspection and Plan Adjustment

Final Confirmation with Supplier

Confirm transportation time, vehicle information, and driver contact details.
Obtain the installation team's detailed contact information and schedule.

Confirm house specifications, color, and customization details for the final time.




Contingency Plan

Prepare backup plans for rainy weather.
Understand common local weather conditions and adjust plans accordingly.
Prepare temporary storage plans in case of installation delays.

Final Recommendation: Create a detailed schedule, breaking down the above tasks into specific dates, and communicate progress with the supplier weekly. Good preparation not only ensures smooth installation but also avoids unnecessary additional costs and delays.

Remember, installing a prefabricated container house is a complex undertaking, and your initial investment will directly determine the final user experience and the lifespan of the house. The earlier you start preparing, the more relaxed you will be when the house arrives.
tinggalkan pesan
tinggalkan pesan
jika Anda tertarik dengan produk kami dan ingin tahu lebih detail, silakan tinggalkan pesan di sini, kami akan membalas Anda sesegera mungkin.

rumah

produk

Berita

kontak